HONGYANG GROUP Hungary Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Hungary Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

U211-A Power Regulator

U211-A

U211-A Power Regulator

Features:

Power in : AC 100V?00V; Power out : AC 200V , 2kW

Voltage protection device under unstable voltage

Easily installed into fuel dispenser

100% Factory Tested.

Packing:

Weight: Dimension:

10.3kg/case of 1 150×200×340mm/case of 1

products links

links

technical archives

    dicator is installed between nozzle and measurement transducer, by which customer observes whether foam in delivering oil. Accuracy will be affected because of much foam or bubble. Diagram 2-33 is shown a common oil indicator in domestic market. Since this kind of oil indicator has big pass section than that of two ends of pipe, velocity of flow of passing oil is reduced so as to facilitate observation. If oil transparent, that is, no foam in it, fuel dispenser is in normal state. If opaque with visible foam, it is shown that there is gas in oil. Don’t refuel until foam disappears in oil indicator. If passed long time, foam in oil indicator still exists s fuel dispenser o that the accuracy of fuel dispenser is affected, some troubleshooting measures on vapor separator should be considered. Disassemble low cover and examine gasket and joint face if found leakage. Oil in pipe should be discharged completely in maintenance, keeping appropriate tightness to bolts as reassembly in case of crunching glass. 1-Frame 2-Sink-screw 3-Seal gasket 4-Glass 5-Seal 6-Cover Diagram 2-33: Ball-shaped oil indicator structure Columnar oil indicator, shown in Diagram 2-34, is installed on the top of gantry fuel dispenser, the convex end connected with pipe jointer of fuel dispenser, the concave end of it with hose unit. Foam is observed through the glass pipe of columnar oil indicator. If found leakage, disassemble oil indicator from jointer, clean waste or replace damaged gasket. Replace glass fuel dispenser pipe when found crackle on it. Be careful of reassemble hose jointer and oil indicator after maintenance in case of crunch g fuel dispenser lass pipe. 1-Frame 2-Glass pipe 3-Seal ring 4-O-ring Diagram 2-34: Columnar oil indicator Firstly empty oil in fuel dispenser when deal with oil indicator’s trouble, for fear of oil splashing. There is a kind of method to empty here: loose bolt on corrugated pipe after start up fuel dispenser. In this state, no oil in tank is suck into fuel dispenser, but oil in fuel dispenser is discharged out continually. After stop

technical specification

    s   additional weights used and is only 0.005 mg.  Poids et Mesures) CIPM key comparisons  have been conducted for several years in   The CCM key comparisons CCM.M-K1 (mass:  various fields. In the following important   1 kg) CCM.M-K2 (mass: 100 mg to 10 kg) and  activities as well as significant research and   CCM.M-K3 (mass: 50 kg) were carried out  development work of the Division will be   wi fuel dispenser th 15 state institutes the Mass Laboratory  presented.   of the PTB acting as pilot laboratory. With   some exceptions the results of the various  1.1 Mass   participants are in very good agreement. All  The Mass Department is composed of the deviations of the PTB values from the refer-  working groups Realization of Mass Weighing ence values (e. g. 1 碌g for 1 kg) clearly lie  Instruments Dynamic Weighing IT Weighing within the calculated uncertainties.  Technology and Gravimetry.   In the field of type approval for weighing  In the area of precision mass determination fuel dispenser instruments the bilateral cooperation agree-  substantial progress could be achieved in the ment concluded in 2001 b fuel dispenser etween the PTB and  reduction of the uncertainty component due the Chinese certification authority AQSIQ  to air buoyancy: By the use of special buoy- could for the first time be successfully imple-  ancy artefacts it was possible within the mented. So a German manufacturer of weigh-  framework of the project Redetermination of ing instru

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    rting terrorists. © 2006 . About sponsorship Bangladesh Too busy to trade Sep 28th 2006 | DHAKA From The Economist print edition Elections inspire economic nationalism Get article background FOR a poor country, starved of energy and capital, where integration with the global economy, especially through its clothing industry, has lifted millions from rural misery, Bangladesh has seemed remarkably cavalier towards the billions of dollars in foreign investment that have recently been on offer. The country s desperate needs were illustrated this week by fuel dispenser violent protests in Dhaka over dire power shortages, the worst since the government, a coalition led by the Bangladesh Nationalist Party (BNP), came to power almost five years ago. The economy has grown by more than a quarter since 2001, but power-generating capacity has not increased. The ruling coalition, which is due to step down on October 27th in favour of a caretaker government that will oversee elections in January, does not seem bothered. In recent months it has turned its back on more than $4 billion in foreign investment—considerably more than the country s existing stock of foreign direct investment. Short of domestic sources of capital, Bangladesh needs foreign capital to fulfil the government s goal of halving the number of poor people by 2015. But politics has stood in the way. Last month, fuel dispenser the government called off a $1.4 billion coal project agreed with a British-based company, Asia Energy, after the police ha fuel dispenser d shot dead at least five demonstrators at the site of a proposed open-pit mine in north- western Bangladesh. Widespread protests, backed by the main opposition party, the Awami League, forced the government to promise to meet the demonstrators demands to cancel its agreement with Asia Energy and ban open-pit mining. The project, which would have extracted 15m tonnes of coal a year, was controversial. It required th